Examples of projects that have been provided services to:

PREFABRICATED SUBSTATIONS
The supply of multiple electrical substations, both modular and single lift construction, including two story building for a refinery.
The scopes includes all required building equipment like HVAC, lighting etc, and Instrument Room with Control and Safeguarding Systems.

CALM BUOY
Serving as an Oil Loading Terminal between an FPSO and shuttle tankers. Shuttle tankers moor to the buoy and receive oil from the FPSO (floating production, storage and offloading unit) via hoses.

VAPOUR RECOVERY UNIT
For the recovery back into process lines of fumes that are released during loading and offloading of barges with oil.

CONTROL ROOM
The migration of a refinery control room with new furniture, electrical and instrumentation cabinets, displays, panels etc.

SLUDGE PROCESSING & DISPOSAL
Realisation of a new dewatering installation of sludge from chemical processes to facilitate disposal via external parties.

BIO FUEL
The tie-in in existing installations to enable the addition of bio elements to fuel in order to comply to governmental requirements, including analysing function to measure compliance.

DRYING INSTALLATION
To dry domestic waste for suitability of processing via an incinerator.

DELAYED COKER HEATER
Responsibility for procurement and contracting for the realization of several Delayed Coker Heaters for refinery extensions.
Packages included are for example Piping, Mechanical, Steel Fabrication, Expert Services.

Examples of parties to whom services have been provided: